Previous Work
Site 1
18A and 18B Mareno Rd, Tullamarine, Victoria
Brief:
The top photo on the left displays a dual-factory project for Almic Plumbing.
The project consisted of two 350sqm factories completed within 4 months from the start of construction.
Both factories were leased within 2 weeks of the completion of the construction.
Site 2
14 Adams Crt, Sunshine, Victoria
Brief:
The second photo on the left displays a 3800sqm factory built for Designer Doorwares.
The factory was built on top of a metre of compacted fill in order to maximise the exposure for the stylish building.
Site 3
21 -27 Stanley Drive, Somerton, Victoria
Brief:
The bottom photo on the left displays a site of four factories of approx 380sqm each.
All four factories were built for the Spandoni Bros and they were all sold directly off the plan


